Chapter 2 System Installation, Start Up And Shut Down; Unpacking And Inspection - Thermo Scientific Omni FTIR Multi Gas CEMS Instruction Manual

Table of Contents

Advertisement

Unpacking and
Inspection
Thermo Fisher Scientific
Chapter 2
System Installation, Start Up and
Shut Down
This chapter provides the recommended procedures and settings for
installing the Omni FTIR Multi Gas CEMS. Installation includes lifting
the FTIR instrument, unpacking and inspection, installing and connecting
the FTIR in the rack and connecting sample and exhaust lines to the
complete system. For details, see the following topics:
"Lifting" on page
"Unpacking and
"Site
"Installing the FTIR Analyzer into the
"External System
"System
"System Shut
Lifting
When lifting the analyzer, use a procedure appropriate to lifting a large
heavy object, such as bending at the knees while keeping your back straight
and upright. It is desirable to have two or more persons moving the
analyzer.
The FTIR instrument is shipped separately from the rack on its own pallet.
Carefully uncrate and inspect the system in a non-condensing environment
(20–30 °C). Check for possible damage during shipment. Remove crate
from around system. Remove four shipping bolts attaching rack to pallet.
Remove wood from sides of rack. Use fork lift to lift system off pallet or
move manually. Ensure hydrator, filters, and FTIR purge gas generator are
still securely fastened to the side of the rack.
2-1
Inspection" on page
Requirements" on page
Connections" on page
Startup" on page
2-10
Down" on page
2-1
2-2
Rack" on page
2-8
2-14