Figure 4-14 Software Downloading Status; Figure 4-15 Software Download Verification Screen - L3 Communications MPM-1000A Operator's Manual

Ruggedized ip modem
Table of Contents

Advertisement

MPM-1000A Operator Manual
8) When the status bar is filled and the data field indicates Verification OK, click
the Software Rollover button. (Figure 4-15)
Refer to Table 4-2 Software Download and Rollover for data descriptions for this
window.
9) When the Confirm window appears, click OK. The rollover may take
approximately 20 minutes. (See Figure 4-16)

Figure 4-14 Software Downloading Status

Figure 4-15 Software Download Verification Screen

4-11
1000-7075 Rev E

Advertisement

Table of Contents
loading

Related Products for L3 Communications MPM-1000A

Table of Contents