ABB AC500 V3 Hardware Manual page 985

Hide thumbs Also See for AC500 V3:
Table of Contents

Advertisement

3.
4.
5.
6.
7.
2.6.3.3
Mounting processor modules PM57x, PM58x, PM59x and PM56xx
1.
2.
2022/01/31
Return the mounted modules to the clean work surface, including any previously mounted
modules.
Drill and tap the mounting holes for the screws (M4 or #8 recommended).
Place the modules back on the panel and check for proper hole alignment.
Attach the modules to the panel using the mounting screws.
If mounting more modules, mount only the last one of this group and put
the others aside. This reduces remounting time during drilling and tapping
of the next group.
Repeat the steps for all remaining modules.
After mounting the Terminal Base on the DIN rail, mount the processor module.
Press the processor module into the Terminal Base until it locks in place.
3ADR010278, 3, en_US
System assembly, construction and connection
AC500 (Standard) > Mounting and demounting
985

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ac500-eco v3Ac500-xc v3

Table of Contents