Mounting The Asd - Toshiba WX9 ASD Installation & Operation Manual

Table of Contents

Advertisement

Mounting the ASD

Install the unit securely to the floor in a well-ventilated area that is out of direct sunlight.
The ambient temperature rating for the WX9 ASD is from 32° to 104° F (0° to 40° C).
The process of converting AC to DC and then back to AC produces heat. During normal ASD
operation, up to 5% of the input energy to the ASD may be dissipated as heat. If installing the ASD in a
cabinet, ensure that there is adequate ventilation.
Note:
Ensure that the ventilation openings are not obstructed.
DO NOT operate the ASD with the enclosure door open or with any enclosure panels removed.
When performing maintenance, DO NOT insert fingers into the holes of the enclosure.
ASDs produce high-frequency noise — steps must be taken during installation to avoid the negative
effects of noise. Listed below are some examples of measures that will help to combat noise problems.
Separate the input and output power conductors of the main circuit. DO NOT install the input and
output wires in the same duct or in parallel with each other, and DO NOT bind them together.
DO NOT install the input or output power conductors of the main circuit and the wires of the
control circuit in the same duct or in parallel with each other, and DO NOT bind them together.
Use shielded wires or twisted wires for the control circuits.
Ensure that the grounding terminals (G/E) of the ASD are securely connected to ground.
Connect a surge suppressor to electromagnetic contactors and relays installed near the ASD.
Install noise filters as required.
16
CAUTION
WX9 ASD Installation and Operation Manual

Advertisement

Table of Contents
loading