Unpacking A Brocade Mlx-8 Router - Brocade Communications Systems MLX Series Hardware Installation Manual

Hide thumbs Also See for MLX Series:
Table of Contents

Advertisement

For information on cabling, refer to
"Attaching a management station"
on page 217.

Unpacking a Brocade MLX-8 router

The Brocade MLX-8 router ships with the following items:
If any items are missing, contact the place of purchase.
Save the shipping carton and packing materials in case you need to move or ship the router at a
later time.
Removing the shipping screws
The router ships with two screws installed in the right side of the router. These screws secure the
fan tray and protect it from damage during shipment. You must remove these screws before
installing the router.
You will need a #2 Phillips screwdriver to remove these screws.
FIGURE 43
1
Front
Lifting guidelines for Brocade MLX-8 routers
Follow these guidelines for lifting and moving Brocade MLX-8 routers:
Brocade MLX Series and NetIron XMR Hardware Installation Guide
53-1003821-01
Switch fabric modules installed in slots marked SF, and slot blanks installed in all empty
module slots.
Insertion or extraction tool for use with RJ45 and fiber-optic connectors.
Figure 43
Removing the shipping screws
2
Rear
3
Before lifting or moving the router, disconnect all external cables.
Do not attempt to lift a fully configured router by yourself.
It is recommended that you install router components after you have installed the router in a
rack.
Installing a Brocade MLX-8 router
"Installing Brocade MLX-8 router power supplies"
on page 122, and
"Connecting the router to a network device"
shows the location of these screws.
Shipping screws
2
on page 64,
59

Advertisement

Table of Contents
loading

Table of Contents