Monitoring Link Status; Enabling Monitoring Link Status; Disabling Monitoring Link Status; Displaying Fabric Link Status (Fix For Html) - Brocade Communications Systems MLX Series Hardware Installation Manual

Hide thumbs Also See for MLX Series:
Table of Contents

Advertisement

NOTE
There is a 10 second delay between the power-off lp command and the power-on lp command. Wait
10 seconds between commands.
Brocade# power-on lp 1
To re-enable power on all interface modules, enter the following command.
Brocade# power-on lp all
In this output example, there is one interface module in slot 3 and slot 3 is powered on.
Brocade# power-on lp all
Slot 3 is powering on.
rw_power_on_lp: write 00070004 to RW_MBRIDGE_CARD_POWER_OFF_REG
Syntax: power-on lp [<slot-number>| all]

Monitoring Link Status

Software and hardware error conditions can bring down fabric links. When all links connecting a
traffic manager to a backplane are down, the traffic manager will drop incoming traffic. If the port
is still up, the traffic manager will continue to drop data. NetIron R05.3.00 and later solve this
problem continuously running a software task on the LP that monitors link status. If it detects that
if the fabric links between the traffic manager and the backplane are down, the software shuts
down the ports connected to that traffic manager, resulting in no continuous traffic drop. If all of
the following criteria are met, the software brings the ports back up:

Enabling monitoring link status

This feature is included by default in NetIron R05.3.00 and later; no configuration is required to
enable it.

Disabling monitoring link status

To disable the link status monitoring feature, enter the following command:
no system-monitoring tm port-control

Displaying fabric link status (Fix for HTML)

To display the fabric link status, enter the following command:
Brocade# show sfm-links 1
Brocade MLX Series and NetIron XMR Hardware Installation Guide
53-1003821-01
The slot-number parameter indicates the slot number for which you are re-enabling the power.
You can specify 1 – 4 for 4-slot routers, 1 – 8 for 8-slot routers, 1 – 16 for 16-slot routers, or 1
– 32 for 32-slot routers.
The all parameter allows you to power on all interface modules.
all the links come back up
at least 30 percent of the total links are in the "up" state
the port is enabled and there are no additional blocking conditions
Monitoring Link Status
6
251

Advertisement

Table of Contents
loading

Table of Contents