To Replace The Power Sequencer; Servicing The Ac Power Cable; Table 10-2 Ac Power Cable Fru List - Sun Microsystems StorEdge 3900 Series Reference And Service Manual

Hide thumbs Also See for StorEdge 3900 Series:
Table of Contents

Advertisement

9. Remove the power sequencer.

To Replace the Power Sequencer

1. Slide the power sequencer into the storage system (
2. Tighten the screws that secure the sequencer to the chassis.
3. Reconnect the grounding strap to the power sequencer.
4. Connect the AC power cable to the power sequencer.
See Section t, "To Replace the AC Power Cable" on page 10-5.
5. Plug the AC power cable into the grounded socket.
6. Connect all cables to the back of the power sequencer.
7. Power on the storage system.
See Sun StorEdge 3900 and 6900 Series 1.1 Installation Guide.
10.2

Servicing the AC Power Cable

This subsection describes the removal and replacement of the AC power cable.
TABLE 10-2
TABLE 10-2
FRU Description
Assembly, cable, rack AC input, international
Assembly, cable, rack AC input, domestic
No tools are required to remove or replace the power cable.
lists the FRUs associated with the power cable:
AC Power Cable FRU List
FIGURE 10-1
Part Number
530-2675
530-2674
Chapter 10 Servicing the Expansion Cabinet
).
10-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents