Figure 7-14 Installing battery signal cables (capacity expansion scenario)
● In capacity expansion scenarios, you need to purchase bottom cascading cables
● In capacity expansion scenarios, bottom cascading cables must be routed from
● Cables outside the device must be routed through cable pipes.
----End

7.7 Installing a Communications Cable

Procedure
Step 1 Connect the network cable to the FE1 port of the product.