2 Wiring

2.4 Making AC Input Connections

ATevo is a commercial product. It is not intended for use at
any time in a residential environment or to be powered by low-
voltage public mains.
It is the responsibility of the installer to provide ac supply wiring
approved for use in the country where installed. When selecting
wire sizes, consult the data nameplate decal affixed to ATevo for
voltage and current requirements.
Follow these steps to supply proper ac power to ATevo:
1. Confirm that the ATevo nameplate voltage rating is correct for
the ac input supply voltage. If ATevo has the Multi-Tap ac input
voltage option, make sure the setting matches the ac input
supply voltage per Section 2.3.2.
2. Use a branch circuit breaker or fused disconnect switch
upstream from ATevo. This device should have lockout
capabilities so that the ac input supply to ATevo can be de-
energized for unit maintenance. A time-delay circuit breaker or
slow-blow fuse is recommended.
3. Size the branch circuit breaker or fused disconnect switch
for ATevo's maximum ac input current as listed on the data
nameplate decal.
4. Size the ac input wiring per the National Electric Code (NEC),
Canadian Electrical Code, local and site codes for the trip rating
of the branch circuit breaker or fused disconnect switch.
5. Do not run external ac input power wiring through the same
conduit as external dc wiring.
6. All site requirements of the facility take precedence over these
instructions.