Download Print this page

Current Main Program - Okuma OSP-U100M Operation Manual

Cnc systems

Advertisement

4203-E P-127
SECTION
6
DISPLAY ON NC OPERATION PANEL
[Supplement]
The DIS data and ACT POSIT (WORK) data of additional axes are displayed in the
following manner.
For the first additional axis, the data is displayed below the "Z-axis" data of DIS
and right
to the
"Z-axis" data of (ACT POSIT) on the screen indicated above. For the second and
third additional axes, the data
is
displayed on the page accessible by pressing function
key [F8] (EXTEND) and [F6] (AXIS CHANGE).
(2)
Current Main Program
N
jP'N
I
AUTO OPERATION
A. MIN
0
I
97/07/15
14
:ToTOO~
PROGRAM
CURRENT MAIN PROGRAM*
1
nrwn
»G1
5H5
G56X0Y0Z500H1
S1000M3
G0X100Y100
CALL
0100
G0X200Y150
CALL
0100
DIS X
0.000
Y
0.000
Z
0.000
W
0.000
CO
0
0
F
0.0
M30
S
0
N
H=
0
D=
0
0.000
0.000
LOAD MONITOR(IIOX)
LOAD MAX
SPINDLE
LOAD
OH
X
Y
Z
w
ACT POSIT (WORK)
0.000
0.000
0.000
0.000
A-Mtd
=PS A
PROGRAM ACTUAL PART
BLOCK
SELECT
I
POSIT. PROGRAM
DATA
SEARCH
CHECK
DATA
[EXTEND]
J
©©©©©©©©
»
:
Block just read
into the buffer
t
Block being executed.
Fig. 6-7 Current Main Program Screen
[Supplement]
For the
spindle
overload monitor specification, the symbol
"
V
"
(max. load value) and
the message "LOAD MONITOR (***
%)"
are displayed on the screen.
The message
"TORQUE MONITOR (*** %)" is displayed instead of "LOAD MONITOR (***
%)'
during torque monitoring for synchronized tapping operation.

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Osp-u10m