B.10 Calibrated Leak Replacement
Equipment Required
M4 Allen Wrench
Flat Head Screwdriver
1. Disconnect the power to back of the unit and unplug.
2. Wait 30 seconds for the high voltage to dissipate.
3. Use an M4 Allen wrench to remove the two screws on the unit's top and open the unit
(Figure B-41).
VS Series Component Leak Detector
Disconnect power from the unit before performing any
WARNING
maintenance procedure that requires physically disconnecting
any part of the system.
Figure B-41 Unit Top Screws