Partial Pressure Plate; Extractor Plate - Agilent Technologies VS Series Operation Manual

Component leak detector
Hide thumbs Also See for VS Series:
Table of Contents

Advertisement

15. Position the new ion support assembly onto the spectrometer header and align.
16. Secure to the spectrometer header using two M5 support screws.
17. Connect the collimator wire to the collimator plate using an M2 screw (Figure B-68).
Collimator Wire
18. Insert the chamber wire into the ion support assembly (Figure B-69).
B-46
VS Series Component Leak Detector
Ensure that no damage is done to the spectrometer wire during
NOTE
disassembly.
M2 Screw
Figure B-68 Partial Pressure Plate
Do not cut the wire by over tightening. Ensure that wire is
CAUTION
contacting the assembly where required and that no short
circuit exists.
Figure B-69 Extractor Plate
Ion Chamber
M1.6 Screw
Chamber Wire

Advertisement

Table of Contents
loading

Table of Contents