Vs C15 Startup Scenario; Leak Rate Vs Analog Output - 2V\Dec - Agilent Technologies VS Series Operation Manual

Component leak detector
Hide thumbs Also See for VS Series:
Table of Contents

Advertisement

System Startup Function
Power up unit: 24 VDC
Turbo ramps to programmed RPM
Turbo reaches programmed RPM
Filaments 1 & 2 are checked and selected
filament activates
System background and turbo bearing
temperature are measured. If these
parameters meet the startup limits the 15
minute stabilization timer stops or times
out.
3-8
VS Series Component Leak Detector
Figure 3-4 Leak Rate vs Analog Output - 2V\Dec
Table 3-2 describes the startup scenario for the I/O interface
NOTE
option.
Table 3-2 VS C15 Startup Scenario
I/O
System Ready – pin 6 low
Busy- pin 7 high
System Ready – pin 6 low
Busy – pin 7 high
System Ready – pin 6 high
Busy – pin 7 low

Advertisement

Table of Contents
loading

Table of Contents