Planning for System Installation

Racked Systems
Site Preparation Checklist
PDU Hardware Specifications
System Power Requirements
Component Chassis Hardware Specifications
System Components
Planning for System Installation
Following items are a part of the planning and site preparation before the
installation of a racked Oracle FS System:
System weight
Physical dimensions
Power requirements
Rack specifications
Hardware specifications
Unpacking requirements
Note: To ensure that all planning requirements have been met and the site is
ready for an Oracle FS System racked installation, follow the site preparation
checklist.
Tip: When moving a heavy racked systems to the installation site, use steel tracks
to guide the system on to the floor. We recommend that a minimum of three
people are used to move the rack, with one person pushing from the front and
one person pulling at the back to help guide the rack. When transporting
configured racks from one location to the other, move them at a speed of 2.13 feet
for each second (0.65 meters for each second) or slower. Carefully examine the
transportation path and avoid obstacles, such as doorways or elevator thresholds
that can cause abrupt stops or shocks. Use ramps or lifts to avoid obstacles and to
enable a smooth transport.
Related Links
Electrostatic Discharge Precautions
Warnings and Cautions
Required Tools
PDU Hardware Specifications
System Power Requirements
Component Chassis Hardware Specifications
Site Preparation Checklist
Oracle FS Systems: Installation Overview
17

Advertisement

Table of Contents
loading

Table of Contents