Srx 210 Services Gateway Electrical And Power Requirements - Juniper SRX 210 Services Hardware Manual

Services gateway
Hide thumbs Also See for SRX 210 Services:
Table of Contents

Advertisement

Table 19 on page 47 provides information on the clearance requirements for
maintaining optimum airflow and the distances for facilitating easy maintenance of
the device.
Table 19: Clearance Requirements for the SRX 210 Services Gateway
Location
Front of the chassis
Rear of the chassis
Between front-mounting flange and rack
or cabinet edge
Between side of the chassis and any
non-heat-producing surface such as a
wall or cabinet side
Between side of the chassis and devices
that have fans or blowers
Related Topics

SRX 210 Services Gateway Electrical and Power Requirements

The electrical and power requirements for the SRX 210 services gateway provide
information on the factors you must consider while planning the electrical wiring
and power availability at your site. These requirements cover the following areas:
Chapter 3: Preparing the Site for the SRX 210 Services Gateway Installation
For service personnel to remove and install hardware components, there must
be adequate space at the front and back of the device. Allow at least 24 in. (61
cm) both in front of and behind the device.
If you are mounting the device in a rack with other equipment, or if you are
placing it on the desktop near other equipment, ensure that the exhaust from
other equipment does not blow into the intake vents of the chassis.
Recommended Clearance
2.5 in. (6.35 cm)
2.5 in. (6.35 cm)
2.5 in. (6.35 cm)
2.5 in. (6.35 cm)
2.5 in. (6.35 cm)
SRX 210 Services Gateway Description on page 3
General Site Guidelines for Installing the SRX 210 Services Gateway on page 43
SRX 210 Services Gateway Cabinet Requirements on page 44
SRX 210 Services Gateway Rack Requirements on page 45
Site Preparation Checklist for the SRX 210 Services Gateway on page 41
Power specifications and requirements for the device
Electrical wiring guidelines for the device installation site
Power, connection, and power cord specifications for the device
Grounding guidelines and specifications for the device
SRX 210 Services Gateway Electrical and Power Requirements
Requirement for Clearance
Space for service personnel to remove
and install hardware components
Space for service personnel to remove
and install hardware components
Space for cable management and
organization
Space for the cooling system to function
properly and to maintain unrestricted
airflow around the chassis
Space for the cooling system to function
properly and to maintain unrestricted
airflow around the chassis
47

Advertisement

Table of Contents
loading

Table of Contents