Caliper Life Sciences Twister II User Manual page 128

Robot
Table of Contents

Advertisement

Teach Tab - Test and Verify Tab
The Test and Verify tab is used to test the positions and paths
leading to and from the instrument selected in the Names tab.
Get Plate Button - Uses the instrument's Approach path, Pick
positions, and Clear path to remove a material from the instrument
selected in the Names tab. If the instrument has more than one
material position, the Plate Location window (see
to specify the position where you want to get the plate.
Put Plate Button - Uses the instrument's Approach path, Place
positions, and Clear path to place a material into the instrument
selected in the Names tab. If the instrument has more than one
material position, the Plate Location window (see
to specify the position where you want to place the plate.
P/N 113564 Rev. 2
Figure 98. Test and Verify Tab
Twister II Robot User's Manual
Appendix A: Software Reference 128
page
page
Caliper Life Sciences, Inc.
134) opens
134) opens

Advertisement

Table of Contents
loading

Table of Contents