Online - Dell C9000 Series Reference Manual

Networking command-line reference guide
Hide thumbs Also See for C9000 Series:
Table of Contents

Advertisement

online

Bring a PE stack-unit back to an online state after running the offline diagnostics tests.
C9000 Series
Syntax
online stack—unit unit-number
Parameters
stack-unit unit-
number
Defaults
none
Command Modes
EXEC Privilege
Command History
This guide is platform-specific. For command information about other platforms, see
the relevant Dell Networking OS Command-Line Reference Guide.
The following is a list of the Dell Networking OS version history for this command.
Version
9.9(0.0)
Example
Dell#diag stack-unit 3 level0 verbose no-reboot
Warning - diagnostic execution will cause multiple link flaps on
the peer side - advisable to shut directly connected ports
Warning - It is highly recommended to reboot the system after
Offline Diagnostics
Proceed with Diags [confirm yes/no]: yes
Dell#Jun 25 05:15:14: %PE-UNKN-C1048P:3 %DIAGAGT-6-
DA_DIAG_STARTED: Starting diags on stack-unit 3
14:19:49 : Approximate time to complete the Diags (level0)... 2
Mins
Related
Commands
Enter the keyword stack-unit and specify the stack-unit
number. The stack-unit number range is from 0 to 7.
Description
Introduced on the C1048P.
diag
— run diagnostic tests on an offline switch.
offline
— places the stack-unit in the offline state to run the diagnostics tests.
PE Console Commands
1616

Advertisement

Table of Contents
loading

Table of Contents