Chain Tensioning Slider Installation; Main Split Bearing Installation; Crankshaft Installation - Husqvarna NUDA 900 R 2012 Workshop Manual

Motorcycle
Table of Contents

Advertisement

NUDA 900 2012/2013 - NUDA 900 R 2012/2013
2
1
CRANKCASE DISASSEMBLY

Chain tensioning slider installation

-
Clean the threading.
-
Insert the chain tensioner slider (2) and tighten the screw (1) to the required
torque.
1
2
H10393

Main split bearing installation

-
Turn the upper crankcase of the engine and support the pistons inside the
cylinders.
-
Check the split bearings for wear or breakage and replace them if necessary.
-
Clean the split bearings and the relevant seats.
The lubrication holes of the split bearings must be located above
the oil channels.
-
Fit all the split bearings in pairs, inserting the prongs in the respective seats.
H10394
If the crankshaft is replaced, also replace the main split bearings.

Crankshaft installation

-
Clean the sealing surfaces.
- Before fitting the crankshaft (2) lubricate all supporting points with engine oil.
-
Insert the crankshaft (2), positioning the timing chain (1) on the crankshaft
gear.
-
Pay attention to the direction of rotation of the timing chain.
-
Check the correct housing of the cylinder connecting rods on the crankshaft.
H10395
F3.15
Workshop Manual Ed. 11-2011

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nuda 900 r 2013Nuda 900 2013

Table of Contents