Husqvarna NUDA 900 R 2012 Workshop Manual page 129

Motorcycle
Table of Contents

Advertisement

NUDA 900 2012/2013 - NUDA 900 R 2012/2013
13
12
16
15
16
GENERAL ENGINE PROCEDURES
-
Disassemble the clutch housing (12), paying attention to the needle roller
bearings (13) and the space bushing (14).
13
14
H10249
-
Disassemble the control gear (15) and the thrust washer (16).
H10250
Installation:
-
Fit the washer (16).
H10251
-
Insert the oil pump control gear (15) in the clutch housing (12), being careful
to correctly couple the engagements of the two parts.
15
12
H10252
F1.15
Workshop Manual Ed. 11-2011

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nuda 900 r 2013Nuda 900 2013

Table of Contents