Timing Chain Removal/Replacement (Engine Removal) - Husqvarna NUDA 900 R 2012 Workshop Manual

Motorcycle
Table of Contents

Advertisement

NUDA 900 2012/2013 - NUDA 900 R 2012/2013
1
3
GENERAL ENGINE PROCEDURES
TIMING CHAIN REMOVAL/REPLACEMENT
(ENGINE REMOVED)
Perform the following operations, as described in the relevant paragraphs, before
disassembling the timing chain:
-
Drain the engine oil.
-
Remove the oil filter.
-
Remove the starter motor.
-
Fix the engine to the engine mount.
-
Remove the spark plug recess ignition coil .
-
Remove the head cover.
-
Check valve clearance.
-
Fix the engine on the top dead centre of the ignition.
-
Remove the camshaft bearing mount.
-
Remove the chain tensioner.
-
Remove both camshafts.
-
Remove the timing chain slider.
-
Remove the chain sprocket.
-
Remove the oil sump.
-
Remove the swing arm housing cover.
-
Remove the right engine crankcase cover.
-
Release the fastening at the top dead centre.
-
Remove the gearbox lever.
-
Remove the left engine crankcase cover.
-
Remove the selector shaft.
-
Remove the lower part of the crankcase.
-
Remove the gearbox output shaft oil seal.
Removal:
-
Mark the installation position of the two caps (2) before removing them.
-
Upon reassembly, the caps must be inverted.
-
Remove the screws (1) and the two caps (2).
2
H10300
-
Move the crankshaft (3) upwards, creating a slight rotary movement and
support it at the base with a suitable tool.
H10301
F1.29
Workshop Manual Ed. 11-2011

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nuda 900 r 2013Nuda 900 2013

Table of Contents