Power Connection

using a line cord that meets the appropriate rating standards.
Plug the projector's high-current line cord into the line input socket located in the lower right corner of the rear
panel of the projector, then plug the 3-pronged end of the line cord into a grounded AC outlet. Ensure the
socket outlet is installed near the equipment and is easily accessible. Input voltage to all Roadster and Mirage
models must be capable of 200 –240 VAC. Use the proper power source and the high-current rated line cord
provided. Refer to
voltage and power range.
will continue to run for approximately 5 minutes to ensure that the projector and lamp have sufficiently cooled,
at which point the fans will automatically shut OFF. To avoid thermal stress that can lead to premature lamp
failure, never unplug the line cord while the lamp cooling fans are running, and never unplug to power down.
2.8

Operating Orientation

Configuration
In the
the "Image Orientation" drop-down list. See
Figure
2-41. Select from options Rear, Inverted
Rear, Front, or Inverted Front according to your
intended installation. Refer to
for further information.
2.9

Leveling

For most installations, the lens surface of the
projector is parallel to the screen. This prevents
major keystoning of the image (i.e., an image with non-parallel sides). In addition, the projector must be kept
level from side-to-side in order for the lamp to function safely. To make small corrections to the projector's
level, rotate each leg as necessary to raise or lower. Refer to
Roadster, Matrix WU, Mirage S+/HD/WU User Manual
020-100002-06 Rev. 1(04-2011)
The North American rated line cord is provided with each projector. Ensure that you are
Section 6 Specifications
Do not attempt operation if the AC supply and cord are not within the specified
Caution for Shutdowns: Once the projector is turned OFF (
Menu highlight and select
Section 3 Operation
for all power requirements.
Figure 2-41 Image Orientation
Figure
Section 2: Installation and Setup