Connect The Line Cord - Christie Mirage S+/HD/WU User Manual

Roadster, matrix wu, mirage s+/hd/wu
Table of Contents

Advertisement

Section 2: Installation and Setup

4. Connect the Line Cord

using a line cord, socket and power plug that meets the appropriate local rating standards.
Connect the projector's line cord to the AC receptacle (Roadster S+20K/HD18K/Mirage HD18/Mirage S+20K
have non-detachable line cords) at the lower corner on the rear of the projector, and to proper AC.
NOTE: The outlet must be near the equipment and easily accessible.
Use only the line cord provided with the projector or a power cord of appropriate ratings that comply with
regional standards. (See below and refer to
requirements).
with specific national electrical safety regulations. For details, refer to the Service Manual and contact your
dealer.
• The Roadster S+12K/HD12K, Matrix WU12, and the Mirage HD12/WU12/S+12K require 200-240 VAC,
50-60 Hz, 12 amps @ 200 VAC.
• The Roadster S+16K and the Mirage S+14K/S+16K require 200-240 VAC, 50-60 Hz, 16 amps @ 200 VAC.
• The Roadster S+20K/HD18K/Mirage HD18/WU18/S+20K require 200-240 VAC, 50-60 Hz, 20 amps @
200 VAC.
power range. Refer to
5. Turn ON the Projector and Lamp.
a. On the projector, turn the power breaker/switch ON. The
LCD Status Display Window displays the initializing
window for 15 seconds, and then indicates
(Figure
b. Using the keypad, do one of the following:
• Press and hold
• Press and release
• Press
The LCD Status Display Window will display Powering Up and
then, Power On
Code window will display ON.
2-2
The North American-rated line cord is provided with each projector. Ensure that you are
line cord replacement must be performed by qualified service personnel in accordance
The
Do not attempt operation if the AC supply and cord are not within the specified voltage and
Section 6
Specifications.
2-1).
briefly to toggle the lamp on.
followed immediately by
.
twice to toggle from the ON/OFF state.
(Figure
2-1) while the two-digit Status/Error
Section 6 Specifications
POWER OFF
Roadster, Matrix WU, Mirage S+/HD/WU User Manual
for complete details on all power
Breaker ON
S/W
Ver :
1.0.00
LCD
Type :
0
(15 sec.)
PCB
Ver :
1
3
Iss
Ver :
Power Off
Powering On
(Lamp is
Power On
ignited)
Figure 2-1 Power ON
020-100002-06 Rev. 1 (04-2011)

Advertisement

Table of Contents
loading

Table of Contents