Installation And Setup; Site Requirements; Physical Operating Environment; Power Connection - Christie Mirage SST Installation And Setup Manual

Hide thumbs Also See for Mirage SST:
Table of Contents

Advertisement

Installation and setup

Learn how to install, connect, and optimize the projector display.

Site requirements

To safely install and operate the projector, the installation location must have restricted access for
authorized personnel only and meet these minimum requirements.

Physical operating environment

Provides specifications for the operating environment.
Ambient temperature (operating) up to 500 m (1640.42 ft):
Type A: 10 to 24°C (50 to 75°F) at full power and at reduced power above 24°C (75°F)
Type B: 10 to 30°C (50 to 86°F) at full power and at reduced power above 30°C (86°F)
Type C, D, E : 10 to 35°C (50 to 95°F) at full power
Humidity (non-condensing) 20 to 80%
Operating altitude: 3,000 m (10,000 ft) maximum at 10 to 25°C (50 to 77°F) ambient

Power connection

A 15A rated wall breaker is required at the installation of the projector.
Ensure a qualified electrician connects the AC power to the laser illumination source and chiller as per
electrical codes.
Mirage SST Installation and Setup Guide
020-102956-08 Rev. 1 (09-2022)
Copyright
©
2022 Christie Digital Systems USA, Inc. All rights reserved.
If printed, please recycle this document after use.
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mirage sst-6p

Table of Contents