Site Planning; Odu Site Selection; Pidu Plus Site Selection - Motorola PTP 600 series User Manual

Ptp 600 series
Hide thumbs Also See for PTP 600 series:
Table of Contents

Advertisement

Site planning

Site planning

ODU site selection

When selecting a site for the ODU, consider the following factors:
It should not be possible for people to stand or walk in front of the antenna.
Height and location to achieve the best radio path.
Height in relation to other objects with regard to lightning strikes.
Aesthetics and planning permission issues.
Distance from the ODU to the connected Network equipment (Maximum cable
run from the ODU to the connected equipment is 100 m [330 ft]).
Distance from the PIDU Plus to the ODU (Maximum cable run from the PIDU Plus
to the ODU is 300 m [990 ft] when using the Fiber interface).
If using the UltraSync unit, ensure that it is exposed to an unobstructed path to
the sky. Please refer to the user manual delivered with the kit.
The effect of strong winds on the installation. See Section
2-7.

PIDU Plus site selection

When selecting a site for the PIDU Plus, consider the following factors:
Indoor location with no possibility of condensation.
Availability of a mains electricity supply.
Accessibility for viewing status indicators and pressing Recovery switch.
2-6
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299
Chapter 2 Planning considerations
Wind loading
on page
phn-0896_012v000
Jul 2010

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ptp 25600Ptp 49600Ptp 54600Ptp 58600Ptp 59600Ptp 48600

Table of Contents