Site Selection Criteria

The following are guidelines for selecting the installation location of the ODU and PDU Plus
for a PTP 600 Series Bridge.
6.1.1
ODU Site Selection
When selecting a site for the ODU the following should be taken into consideration:
It is not possible for people to stand or walk inadvertently in front of the antenna
Height and location to achieve the best radio path
Height in relation to other objects with regard to lightning strikes
Protection from the weather
Aesthetics and planning permission issues
Distance from the ODU and connected Network equipment (Maximum cable run from the
ODU to the connected equipment is 100m [330 ft])
Distance from the PIDU Plus to the ODU (Maximum cable run from the PIDU Plus to the
ODU is 100m [330 ft] when using the 1000BaseT interface)
6.1.2
PTP 600 Series Bridge PIDU Plus Site Selection
When selecting a site for the PIDU Plus the following should be taken into consideration:
Availability of a mains electricity supply
Accessibility for viewing status indicators and pressing reset switch (See Section
and Section