Site Planning; Site Selection Criteria - Motorola PTP 48600 User Manual

Ptp 600 series
Hide thumbs Also See for PTP 48600:
Table of Contents

Advertisement

Site planning

Site planning

Site selection criteria

The following are guidelines for selecting the installation location of the ODU and
PIDU Plus for a PTP 600 Series.
ODU site selection
When selecting a site for the ODU the following should be taken into consideration:
It should not be possible for people to stand or walk in front of the antenna
Height and location to achieve the best radio path
Height in relation to other objects with regard to lightning strikes
Aesthetics and planning permission issues
Distance from the ODU and connected Network equipment (Maximum cable run
from the ODU to the connected equipment is 100m [330 ft])
Distance from the PIDU Plus to the ODU (Maximum cable run from the PIDU Plus
to the ODU is 300m [990 ft] when using the Fiber interface)
If using the GPS Sync Unit, ensure that it is exposed to an unobstructed path to
the sky. Please refer to the "GPS Synchronization Unit Kit" User Manual
delivered with the kit.
The effect of strong winds on the installation – see Section
2-7.
PIDU Plus site selection
When selecting a site for the PIDU Plus the following should be taken into
consideration:
Availability of a mains electricity supply
Accessibility for viewing status indicators and pressing Recovery switch.
2-6
UNDER DEVELOPMENT
Chapter 2 Planning considerations
Wind loading
phn-0896_009v003
Feb 2010
on page

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ptp 25600Ptp 45600Ptp 49600Ptp 54600Ptp 58600Ptp 59600

Table of Contents