Site Planning; Site Selection Criteria; Odu Site Selection; Ptp 300 Series Bridge Pidu Plus Site Selection - Motorola PTP 300 Series User Manual

Motowi4 series
Hide thumbs Also See for PTP 300 Series:
Table of Contents

Advertisement

6 Site Planning

6.1 Site Selection Criteria

The following are guidelines for selecting the installation location of the ODU and PIDU Plus for
a PTP 300 Series Bridge.

6.1.1 ODU Site Selection

When selecting a site for the ODU the following should be taken into consideration:
• It is not possible for people to stand or walk inadvertently in front of the antenna
• Height and location to achieve the best radio path
• Height in relation to other objects with regard to lightning strikes.
• As high as practically possible over obstructions
• Point it at the Remote end
• Aesthetics and planning permission issues
• Distance from the ODU and connected Network equipment (Maximum cable run from the ODU
to the connected equipment is 100m [330 ft])

6.1.2 PTP 300 Series Bridge PIDU Plus Site Selection

When selecting a site for the PIDU Plus the following should be taken into consideration:
• Availability of a mains electricity supply
• Accessibility for viewing status indicators and pressing Recovery switch.

6.1.3 Path Loss Considerations

The path loss is the amount of attenuation the radio signal undergoes between the two ends of the
link. The path loss is the sum of the attenuation of the path if there were no obstacles in the way
(Free Space Path Loss), the attenuation caused by obstacles (Excess Path Loss) and a margin to
allow for possible fading of the radio signal (Fade Margin).
Where
L
= Free Space Path Loss
free_space
L
= Excess Path Loss
excess
L
= Fade Margin Required dB
fade
L
= Seasonal Fading
seasonal
L
= Equipment Capability dB
capability
Site Planning
L
+ L
+ L
excess
free_space
dB
dB
dB
+ L
< L
fade
seasonal
capability
42
(3)

Advertisement

Table of Contents
loading

Table of Contents