Preparing For Standard Installations - Motorola PTP 600 series User Manual

Ptp 600 series
Hide thumbs Also See for PTP 600 series:
Table of Contents

Advertisement

Preparing for standard installations

Preparing for standard installations
NOTE
It is common practise to pre-configure the ODUs during staging before site
installation. Refer to
information.
Before proceeding with the installation, perform the following checks:
Check that a link plan is available and that it is based on the principles described
in
Chapter 2 Planning
Check that the correct components are available. For a typical inventory, refer to
Inventory for standard installations
Check the contents of all packages against the parts lists shown in their packing
lists.
Ensure that qualified installers are available to undertake the work.
Ensure that all safety precautions can be observed.
The following specific tools are required to install a PTP 600 Series, in addition to
general tools:
13mm wrench and 22 mm wrench for use with the glands.
RJ45 crimp tool (it must be the correct tool for the type of RJ45 being used).
Personal Computer (PC) with 10, 100 or 1000 BaseT Ethernet.
Either Internet Explorer 7, Internet Explorer 8, Firefox 3 or Firefox 3.5.
Ethernet patch cables.
5-2
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299
Chapter 6 Configuration and alignment
considerations.
on page 4-2.
Chapter 5 Installation
for more
phn-0896_012v000
Jul 2010

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ptp 25600Ptp 49600Ptp 54600Ptp 58600Ptp 59600Ptp 48600

Table of Contents