Test link end hardware
Test link end hardware
Before testing link end hardware, confirm that all outdoor drop cables, that is those
that connect the ODU or GPS receiver (if installed) to equipment inside the building,
are of the supported type, as defined in
16.
If the Power and Ethernet LEDs do not illuminate correctly during the start-up
sequence, test the link end as described in the flowchart
procedures that follow.
If a UltraSync GPS synchronization unit has been installed, but one or more of its
status LEDs are not illuminated, refer to
8-2
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299
Chapter 8 Troubleshooting
Cable and connector
specificationson page
(Figure
Test UltraSync GPS receiver
4-
8-1) and detailed test
on page 8-15.
phn-0896_012v000
Jul 2010