User Guide: PTP 600 Series
Connecting the ODU to the top LPU
Perform this procedure to connect the ODU to the top lightning protection unit (LPU)
via ground and drop cables, and to ground the ODU to the supporting structure
(Figure
5-7).
It is often easier to connect the ODU to the short drop cable (that leads to the top LPU)
on the ground or a suitable surface prior to mounting the ODU.
Figure 5-7 ODU and top LPU grounding
To connect and ground the ODU and top LPU, proceed as follows:
Procedure 5-5 Connect ODU and LPU
1
Prepare two sections of drop cable with the correct glands and
connectors, as described in
2
Connect one end of the back-to-back cable to the PIDU Plus port of the
ODU as described in
page 5-9.
phn-0896_012v000
Jul 2010
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299
One is a short length (not more than 600 mm) to connect the ODU to
the top LPU. Use the back-to-back cable supplied in the LPU kit.
The other is a long one to connect the top LPU to the bottom LPU.
Connecting the drop cable to an ODU or LPU
Installing the drop cable and ground cables
Preparing the drop cable
on page 5-3:
on
5-19