Figure 5-8 Drop cable grounding on a mast or tower

Tower Ground Bar (TGB)
To install and ground the drop cable down the mast, proceed as follows:
Procedure 5-6 Install and ground drop cable down the mast
1
Check that the long drop cable is connected to the mast top LPU.
2
Lay the drop cable as far as the building entry point, ensuring there is
enough length to extend through the wall of the building to the LPU
inside.
3
Attach the drop cable to the mast using the cable ties provided.
4
At the first point of contact between the drop cable and the mast, near the
top, ground the drop cable to the mast as described in
cable
5
At the mid point of the mast, and at any additional grounding points,
ground the drop cable to the mast as described in
cable
7
At the point where the drop cable leaves the mast, ground it to the ground
bar as described in
phn-0896_012v000
Jul 2010
4Gon www.4Gon.co.uk info@4gon.co.uk Tel: +44 (0)1245 808195 Fax: +44 (0)1245 808299
To top LPU
First point of contact with tower
Mid-point of tower
Bottom of tower
on page 5-5.
on page 5-5.
Grounding the drop cable
Installing the drop cable and ground cables
Screened CAT5e cable
Ground cable
To building entry point
Grounding the drop
on page 5-5.
Grounding the drop
5-21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ptp 25600Ptp 49600Ptp 54600Ptp 58600Ptp 59600Ptp 48600

Table of Contents