Inspection, Cleaning, And Packaging; Initial Inspection; Maintenance - Xantrex XDC 10-600 Operating Manual

6000 watt and 12000 watt series digital programmable dc power supply
Hide thumbs Also See for XDC 10-600:
Table of Contents

Advertisement

Installation

Inspection, Cleaning, and Packaging

Inspection, Cleaning, and Packaging
Initial
When you receive your power supply, do a quick visual check.
Inspection
1. Ensure that the box contains the power supply, the operating manual, the AC
input cover and strain relief, and the output cover.
2. Inspect the unit for scratches and cracks as well as broken switches, connectors,
or displays.
If the unit is damaged, save all packaging materials and notify the carrier
immediately.
Maintenance Routine servicing of the power supply is not required except for periodic cleaning.
Whenever a unit is removed from operation, clean the metal surfaces with naphtha
or an equivalent mild solvent, and clean the front panel with a damp cloth using a
weak solution of soap and water. Use low-pressure compressed air to blow dust from
in and around vent openings and components on the printed circuit boards.
34
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Operating Manual for XDC Series Power Supply

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents