Section 2. Installation

Overview

Section 2 provides recommendations and procedures for inspecting, installing, and
testing the power supply. For more information about controls and connectors, refer
to the front panel diagrams (Figure 1.1 to Figure 1.5) as well as the rear panel
diagram (Figure 1.6) in Section 1.

Basic Setup Procedure

Table 2.1 provides a summary of the setup procedure and an overview of the
subsections in this chapter. Use this table as a quick reference if you are familiar with
the installation requirements for the power supply. If you require more information,
each step in the table refers to a subsequent section which contains more details.
Complete each step in the sequence given.

Table 2.1 Basic Setup Procedure

Step # Description
1
Inspection
2
Installation
3
Input Power
4
Test
5
Select Wires
6
Connect Load
7
Connect Remote
Sensing (if required)
Release 3.0
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Action
Visually inspect the power supply.
Install the power supply, ensuring
adequate ventilation.
Connect AC input power.
Perform functional tests for voltage
mode operation, current mode
operation, and front panel controls.
Select wires that can tolerate the DC
current output.
Connect the load wires to the DC output.
Connect remote sensing connectors on
power supply to load.
Reference
"Inspection, Cleaning, and
Packaging" on page 34
"Location, Mounting, and
Ventilation" on page 37
"AC Input Power" on page 40
"Basic Checks or Self-Tests"
on page 45
"Load Wiring" on page 48
"Load Connections" on page 50
"Remote Sensing" on page 56
33