Using Auto Sequencing - Xantrex XDC 10-600 Operating Manual

6000 watt and 12000 watt series digital programmable dc power supply
Hide thumbs Also See for XDC 10-600:
Table of Contents

Advertisement

Using Auto
Auto Sequence programs can be set to run as a Power ON default or recalled from
memory by pressing the RECALL key. In Auto Sequence mode, 3 of the function
Sequencing
keys operate as alternates:
VOLTAGE operates as RUN/PAUSE.
CURRENT operates as TRIGGER.
STORE operates as END.
In the following discussion about running programs in Auto Sequence mode, each
of the keys mentioned above is referred to as their alternate function.
When an Auto Sequence program is launched from Recall, the AUTO SEQ
annunciator illuminates on the front panel. Press EXIT to return the unit to normal
operating mode.
Auto sequence programs can operate 3 different ways:
They can run automatically through a series of steps, repeating those steps a
pre-set number of times if necessary, and complete their operation without
intervention from an operator.
They can run automatically and be paused. If you need to stop the program
temporarily, you can press PAUSE to stop it, and then press RUN to resume the
program's operation when ready. When a sequence is manually paused, the
Pause annunciator is illuminated. (The output remains on and voltage may be
present at the output.)
They can run automatically programmed to wait for a trigger at certain points in
the sequence. If you want the program to resume, you can press TRIGGER or
supply a trigger signal to the rear panel Trigger input. When a sequence is paused
by a trigger, the Trigger? annunciator is illuminated.
During operation, press the Up key to display information on the currently running
sequence including sequence number, step number, step parameters (settings), the
trigger source, as well as the loop count.
To run an auto sequence program:
Step # Do This
1
2
3
4
Release 3.0
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
4 times
RECALL
ENTER
ENTER
RUN
Power Supply Operation
You Will See
Auto Sequence
Auto Seq 1
Seq 1 ready
#####V #####A
Operation
97

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents