Installation
5: Performing Functional Tests
Step
The functional test procedures include:
For information on local operation, see "Local Operation" on page 3-1
for adjusting front panel controls and settings.
Powering the Power Supply On/Off
To power on the power supply:
1.
2.
3.
4.
To power off the power supply:
2-10
Power-on and front panel functional checks
Voltage mode operation and current mode operation checks.
Ensure that the front panel power switch is in the Off position.
Ensure that the AC line voltage is within operating range.
Connect the line cord to a grounded AC outlet.
Turn the front panel power switch to the On position.
After a short power-on delay,
output voltage and current displays, followed by
After approximately 1 second, the display returns to normal status.
Turn the front panel power switch to the Off position.
will blink on the display. The ALARM LED illuminates.
After a short delay, all lights on the display will not be illuminated.
illuminates on the
.
M370430-01 Rev B