Extreme Networks Summit X150 Series Hardware Installation Manual page 309

Summit family
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

The following sections describe the specific steps for installing the EPS-C2 chassis.
Note
An AC power cord is not provided with the Summit 750 W AC power supply. See
Power Supply Cords
Installing an EPS-C2 Chassis
Figure 287: EPS-C2 Power System and Summit Switch
To mount the EPS-C2 chassis in a rack:
1
Place the EPS-C2 chassis upright on a secure work surface.
2 Remove the mounting bracket kit from the packaging.
3 On each side, attach a rack mounting bracket:
a Place a rack mounting bracket over the mounting holes.
Summit Family Hardware Installation Guide
for information about selecting a power cord.
Installing Summit External Power Supplies
Selecting
309

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents