Extreme Networks Summit X150 Series Hardware Installation Manual page 279

Summit family
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

5 Secure the mounting bracket flanges to the rack, using screws that are appropriate for the rack.
(Rack-mounting screws are not provided.)
6 Ground the switch if grounding lug is present (X670 series switches).
a Strip 0.25 inch from the end of the AWG # 14 copper wire.
b Securely crimp the provided ring terminal onto the stripped wire.
c Insert the provided M4 screw through the ring terminal and into the grounding stud on the front
of the switch (see
d Securely tighten the screw.
Figure 259: Grounding a Summit X670 Series Switch
The Summit X670 and X770 series switches are shipped without installed power supplies. You can
install one or two power supplies. After the switch is secured to the rack, install the necessary power
supplies for your configuration. For instructions, see the following pages:
Installing a Summit 450 W or 550 W AC Power Supply
Installing a Summit 450 W or 550 W DC Power Supply
Note
If you are installing a VIM4 module in the Summit X670V-48x switch, install it in the switch
before you connect the switch to power (see
Summit X480, X650, or X670 Series
Front-Mounting a Switch in a Two-Post Rack
To front-mount a Summit X670 or X770 series switch in a two-post rack:
1
Attach each mounting bracket as follows:
a Set the bracket against the switch housing, with the flange even with the front panel of the
switch (see
b Use six of the provided screws to secure the bracket to the switch housing.
Summit Family Hardware Installation Guide
Figure 259: Grounding a Summit X670 Series Switch
Figure 260: Attaching a Rack-mounting Bracket (X670 shown)
Installing Summit Family Switches
Installing a Versatile Interface Module in a
Switch).
on page 279).
on page 280).
279

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents