3Com 3CRWX120695A Reference Manual page 174

Wireless lan mobility system wireless lan switch manager
Hide thumbs Also See for 3CRWX120695A:
Table of Contents

Advertisement

174
C
4: P
HAPTER
LANNING THE
3C
M
S
OM
OBILITY
YSTEM
information, and projected RSSI information that is useful when verifying
the installation.
After deployment, you can generate a work order with the optional RSSI
projection tables and MAP MAC addresses, and use it for
post-deployment verification.
To generate a work order
1 In the Work Order Options group box, specify whether to include the
following information in the work order:
RF Coverage
RSSI Projections
Show Disabled MAPs (only available if RSSI Projections is selected)
Show RF Coverage On Entire Floor (only available if RSSI
Projections is selected)
Show Unreachable MAPs (only available if RSSI Projections is
selected)
Show MAPs on Other Floors (only available if RSSI Projections is
selected)
2 In the Language list, select English or German.
The language you select is the language used when you next access this
page.
3 To select the directory to which the inventory report is saved, click
Choose. The Select dialog box appears.
4 Navigate to the directory you want, and click Select.
3WXM uses this directory when generating subsequent reports. For UNIX
and Linux systems, the default directory is the home directory of the user
running 3WXM.
5 Click Generate Work Order.
The work order is saved in the directory you specified in the format
WO_scope_name_date. If you generate another order for the same scope
on the same day, the old work order is overwritten.
When the work order has been generated, the View Work Order
button becomes available.
6 Click View Work Order. A browser window opens to display the work
order in HTML format.

Advertisement

Table of Contents
loading

This manual is also suitable for:

3crwx440095a

Table of Contents