12. Remove the secondary three-slot riser cage:
a. Loosen the captive screws (callouts 1).
b. Lift the riser cage off the system board (callout 2).
13. Remove the tertiary riser cage:
a. Loosen the captive screws (callout 1).
b. Lift the riser cage out of the slot (callout 2).
HPE ProLiant DL385 Gen11 Server Maintenance and Service Guide
68