7. Hold the lift tabs and pivot the rail frame to the closed position.
A click sound indicates that the rail frame is properly engaged.
8. Close the retention frame:
a. When using a torque wrench to tighten the retention frame screw, set a torque between 1.24 N-m (11 lbf-in) to 1.47 N-m (13 lbf-in) .
b. Pivot the spring loaded retention frame downward and hold it down (callout 1).
c. Tighten the retention frame screw (callout 2).
HPE ProLiant DL385 Gen11 Server Maintenance and Service Guide
260