HPE ProLiant DL385 Gen11 Maintenance And Service Manual page 61

Table of Contents

Advertisement

Procedure
Procedure
1. Power down the server.
2. If installed, open the cable management arm.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the rack .
6. Place the server on a flat, level work surface.
7. Remove the access panel .
8. Remove the fan cage.
9. Remove the midwall bracket .
10. Disconnect all cables from the drive backplanes.
11. Remove the drive backplane bracket screws.
HPE ProLiant DL385 Gen11 Server Maintenance and Service Guide
61

Advertisement

Table of Contents
loading

Table of Contents