HPE ProLiant DL385 Gen11 Maintenance And Service Manual page 140

Table of Contents

Advertisement

CAUTION:
CAUTION:
The port blank provides EMI shielding and helps maintain proper thermal status inside the server. Do not operate the server
when a port blank is removed without the corresponding I/O port option installed.
Procedure
Procedure
1. Power down the server.
2. If installed, open the cable management arm.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the rack .
6. Place the server on a flat, level work surface.
7. Remove the access panel .
8. If the rear 4 LFF drive cage is installed, remove it.
9. Remove the riser cage.
10. Remove the OCP slot blank:
a. Remove the blank screw (callout 1).
b. Use a plastic spudger to pry the top side of the blank from the chassis (callout 2).
c. Remove the blank (callout 3).
Retain the screw and blank for future use.
HPE ProLiant DL385 Gen11 Server Maintenance and Service Guide
140

Advertisement

Table of Contents
loading

Table of Contents