Powering Down The Server - Oracle X7-2L Service Manual

Hide thumbs Also See for X7-2L:
Table of Contents

Advertisement

"Powering Down the Server" on page 53
"Disconnect Cables From the Server" on page 59
"Extend the Server to the Maintenance Position" on page 60
"Remove the Server From the Rack" on page 61
"Take Antistatic Measures" on page 62
"Remove the Server Top Cover" on page 63
Related Information
"Returning the Server to Operation" on page 211

Powering Down the Server

Determine how you want to power down the server by reviewing the options in the following
table.
Some server components, such as storage drives, power supplies, fan modules, and M.2
Note -
flash SSDs are hot-pluggable. Components that are hot-pluggable do not require the server to be
powered down when performing service procedures.
Description
Power down the server gracefully to prevent data from
being corrupted. Performing a graceful shutdown ensures
that the system is ready for restart.
If the server is not responding, or you must shut down
the server quickly, perform an immediate shutdown.
Related Information
"Power On the Server" on page 216
Preparing the Server for Component Replacement
Link
"Power Down the Server Gracefully Using the
Oracle ILOM CLI" on page 54
"Power Down the Server Gracefully Using the
Oracle ILOM Web Interface" on page 55
"Power Down the Server Gracefully Using the On/
Standby Button" on page 56
"Power Down the Server for Immediate Shutdown
Using the Oracle ILOM CLI" on page 57
"Power Down the Server for Immediate
Shutdown Using the Oracle ILOM Web
Interface" on page 57
"Power Down the Server for Immediate Shutdown
Using the On/Standby Button" on page 58
Preparing for Service
53

Advertisement

Table of Contents
loading

Table of Contents