Replacement/Adjustment Procedures
Routine Replacement/Adjustment
CAUTION
The plate loader PEEK tubing can be deformed, which could affect sample flow.
When routing the plate loader PEEK tubing to and from the Sample Station, be
careful not to pinch, crimp, stretch, or break the tubing.
6
Pull the plate loader PEEK tubing through the slot so the tubing sits inside the instrument.
7
Loosen the white plastic thumbscrew behind the plate loader sample probe.
11-30
B49006AH