6
Apply
Select
7
Select
OK
8
Select the Levey-Jennings plot and select the start and end date from the drop down boxes at
the top of the LJ Chart screen to specify the desired date range.
NOTE
Select the desired configuration and date range from the drop-down menus located at the top of
the LJ Chart screen to sort by the configuration used during the specified date range.
9
Select
Close QC/Standardization
QC Result Manager
The QC Result Management window can be used to search, delete, print, and export QC results.
B49006AH
.
.
in the File menu to exit the QC screen.
Instrument Quality Control and Standardization
4
Confirming Results
4-21