Rear Half Shaft Installation - Polaris RZR 900 2015 Service Manual

Table of Contents

Advertisement

6. 50" ONLY Remove the fasteners
stabilizer bar to the upper control arm.
t
7. Remove the fasteners
arm to the bearing carrier.
8. Rotate the bearing carrier down while pushing in on
the half shaft.
CAUTION
Be careful not to pinch or stretch the brake line. Use
rope or wire to secure the bearing carrier.
9. With a quick, short jerk outward, remove the half shaft
from the transmission.
9926814 R08 -
Manual
© Copyright Polaris Industries Inc.
r
retaining the rear
retaining the upper control
2015-2016 RZR 900

REAR HALF SHAFT INSTALLATION

1. If the half shaft is not being replaced, install a new
q
spring ring
on the half shaft. Apply anti-seize to the
w
splines
.
2. Align splines of the half shaft with transmission
splines and reinstall the half shaft by pushing in with a
quick jerk.
3. Install the half shaft through the carrier bearing and
rotate the bearing carrier upward. Install fasteners
and torque to specification.
TORQUE
Bearing Carrier Mounting Fasteners:
42 ft-lb (57 Nm)
2016 RZR S 1000 Service
FINAL DRIVE
7
e
7.13

Advertisement

Table of Contents
loading

Table of Contents