Polaris RZR 900 2015 Service Manual page 167

Table of Contents

Advertisement

14. Install the appropriate tappet.
NOTE
Lubricate the outer portion of the valve bucket upon
installation.
15. Repeat steps 10-14 until all necessary valves have
been adjusted.
16. Reinstall the camshafts and camshaft carriers and
tighten the bolts evenly to specification.
TORQUE
Camshaft Carrier Bolts:
89 in-lbs (10 Nm)
17. Measure and confirm that valve clearance is now
within specification for each valve.
18. If valve clearance is not within specification, repeat
this procedure.
19. If all valve clearance measurements are now within
specification, remove the camshaft carriers and
proceed to Camshaft Installation / Timing, page 3.82.
9926814 R08 -
Manual
© Copyright Polaris Industries Inc.
2015-2016 RZR 900
ENGINE / COOLING SYSTEM
2016 RZR S 1000 Service
3
3.89

Advertisement

Table of Contents
loading

Table of Contents