Polaris RZR 900 2015 Service Manual page 110

Table of Contents

Advertisement

ENGINE / COOLING SYSTEM
20. Install the six exhaust head pipe fasteners
two springs retaining the pipe to the muffler
Torque screws to specification.
TORQUE
Exhaust Head Pipe Screws:
18 ft-lb (24 Nm)
21. Install the five bolts retaining the frame support bar
above the engine. Torque Bolts to Specification.
TORQUE
Frame Support Bolts:
22 ft-lb (30 Nm)
22. Install the six plastic rivets retaining the engine divider
l
panel
and install the clamp retaining the main
1(
harness ECU leads
9926814 R08 -
3.32
j
and the
to the panel.
23. Install the nine screws for the air intake housing cover
k
.
over the air box
Intake Housing Cover Screws:
24. Connect the harness plugs to the ECU and install the
four screws mounting the ECU to the divider panel.
Torque screws to specification.
25. Install the ECU cover panel and the seat.
26. Fill the cooling system with coolant and bleed the
system. See Chapter 3 – Cooling System Bleeding,
page 3.16
27. Connect
the
specification.
Battery Terminal Fasteners:
2015-2016 RZR 900
2)
. Torque fasteners to specification.
TORQUE
8 ft-lb (11 Nm)
TORQUE
ECU Mounting Screws:
24 in-lb (3 Nm)
battery.
Torque
TORQUE
60 in-lb (7 Nm)
2016 RZR S 1000 Service
© Copyright Polaris Industries Inc.
fasteners
to
Manual

Advertisement

Table of Contents
loading

Table of Contents