Valve Sealing Test - Polaris RZR 900 2015 Service Manual

Table of Contents

Advertisement

ENGINE / COOLING SYSTEM
11. Install the valve tappet
they were removed.
NOTE
Oil the tappet prior to installing.
If any valve train components were replaced, refer to
Valve Clearance Adjustment, page 3.87.
9926814 R08 -
3.80
i
for each valve in the order
2015-2016 RZR 900

VALVE SEALING TEST

1. Clean and dry the combustion chamber area
2. Pour a small amount of clean solvent into each
w
intake port
and check for leakage around the
valves. The valve seats should hold fluid with no
seepage.
3. Repeat for exhaust valves by pouring fluid into each
e
exhaust port
.
q
.
2016 RZR S 1000 Service
Manual
© Copyright Polaris Industries Inc.

Advertisement

Table of Contents
loading

Table of Contents