Polaris RZR 900 2015 Service Manual page 329

Table of Contents

Advertisement

21. Align the splines of the drive shaft with the
transmission splines. Push inward on the control arm
assembly until the rear drive shafts lock into the
transmission splines.
d
22. Install new fasteners
retaining the upper control
arms to the bearing carriers on each side. Torque to
specification.
23. Install the stabilizer bar link mounting bolts and new
f
nuts
. Torque to specification.
24. Install rear wheels, wheel nuts and hub castle nuts.
Torque to specification.
TORQUE
Stabilizer Bar Linkage:
40 ft-lbs (54 Nm)
Wheel Nuts:
Aluminum: 120 ft-lbs (163 Nm)
Steel: 60 ft-lb (81 Nm)
Hub Castle Nuts:
180 ft-lbs (244 Nm)
25. Properly lower the vehicle.
9926814 R08 -
Manual
© Copyright Polaris Industries Inc.
26. Install the air box assembly as outlined in the EFI
Chapter (see Chapter 4 – ETC Replacement, page
4.24.
27. Install the rear bumper and cargo box as an assembly
(see Chapter 5 – Rear Cargo Box / Fenders, page
10.16).
28. Connect the (-) negative battery cable.
29. Install the engine service panel
seats
30. If transmission lubricant was drained, fill the
transmission with the specified amount of Polaris
AGL (see Chapter 2 – Transmission Lubrication,
page 2.26.
Recommended Transmission Lubricant:
2015-2016 RZR 900
TRANSMISSION
g
, console cover and
j
.
FLUID CAPACITY
AGL (PN 2878068) (Quart)
Capacity: 44 oz. (1300 ml)
2016 RZR S 1000 Service
6
6.13

Advertisement

Table of Contents
loading

Table of Contents